HMMWV · TM 9-2320-280-10

HMMWV PMCS App — Free 5988 & TM 9-2320-280-10 Checklist

Free Army PMCS checklist for the HMMWV (Humvee) — all 5 intervals based on TM 9-2320-280-10. Run your checks on your phone and print your 5988 at the motorpool. No download, no login.

PMCS CHECKLISTS — SELECT INTERVAL

NFMC items ground the vehicle. Any fault on a No Further Movement Criteria item means the vehicle must not be dispatched until repaired. Annotate all faults on DA Form 5988 and report to your motor sergeant immediately.

HMMWV (HUMVEE) PMCS — COMMON QUESTIONS

What TM covers HMMWV PMCS?
HMMWV PMCS is covered by TM 9-2320-280-10, the operator's manual for the High Mobility Multipurpose Wheeled Vehicle (HMMWV). This TM defines all five PMCS intervals — Before, During, After, Weekly, and Monthly — and lists every check item operators must complete. ArmyADP.com's HMMWV PMCS app is built directly from TM 9-2320-280-10.
What are the NFMC items on a HMMWV PMCS?
NFMC (No Further Movement Criteria) items on the HMMWV include critical safety faults such as steering gear box leaks, front wheel bearing play, broken leaf springs or missing U-bolts, brake lining below minimum thickness, and fuel or brake fluid leaks. Any NFMC fault must be annotated on DA Form 5988 and reported to the motor sergeant — the vehicle is deadlined until the fault is corrected.
How do I fill out a DA Form 5988 for a HMMWV?
To fill out a DA Form 5988 for a HMMWV, record the vehicle's bumper number, NSN, and TM reference (TM 9-2320-280-10) in the header. For each fault found during PMCS, annotate the TM item number, describe the fault, and mark the fault symbol — X for NFMC, slash (/) for a fault that does not deadline the vehicle. Sign and date the form, then turn it in to your motor sergeant. ArmyADP.com's printable 5988 generator pre-fills the vehicle data and lets you annotate faults on-screen before printing.
How often do you do PMCS on a HMMWV?
HMMWV PMCS is performed at five intervals: Before Operations (every time before you drive), During Operations (while the vehicle is running — check gauges, listen for abnormal sounds), After Operations (every time after you return), Weekly (once per week regardless of use), and Monthly (once per month). Before and After PMCS are the most critical — they catch the majority of faults before they become deadlines.
Can I run HMMWV PMCS on my phone?
Yes — ArmyADP.com's HMMWV PMCS app runs entirely in your phone's browser. No download, no login, no app store. Open the checklist at the motorpool, tap each item as you complete it, and the app tracks your progress. When you're done, generate and print a DA Form 5988 directly from your screen. Works on any iPhone or Android.

RELATED PMCS CHECKLISTS

Running a mixed motor pool? Check the PMCS for these vehicles next:

SPREAD THE WORD

Know a Soldier who needs this at the motorpool? Send them the free HMMWV (Humvee) PMCS app.

SHARE THIS PMCS APP